• MOBILE WEIGHBRIDGE

    Slideshow Image 1 Slideshow Image 2

    Model No. PL-3001 FM

  • Features:

    • Steel fabricated design - completely supplied with platform, bottom frame and ramps.
    • Needs no R.C.C. foundation.
    • Transportation and re-installation is cost effective.
    • Most suited for temporary sites.
    • Saves time and construction costs significantly.
    • Fabricated with high grade raw material to ensure maximum efficiency.
    • Easy Installation.
    • Smooth operation.
    • These are most suitable for temporary sites e. g. Construction sites. Ramps are steel fabricated; therefore do not need traditional cement foundation.
    • Conventional weighbridges need one to two months for commissioning after placing the order, whereas Mobile weighbridges takes only a couple of days for installation at site.
    • The load cells are installed between the frame and the top frame.